Client

St.George (West London) Ltd

Architect

tp bennett

Structural Engineers

Watermans Structures Ltd

Contract Form

Berkeley Group – Project Specific Instruction (PSI)

Contract Value

£1.59 Million

The Cinema at Ealing was a renowned Art Deco Masterpiece dating back the thirties. Having fallen into a state of decrepitude Goldsmith’s were engaged to carry out a total refurbishment of the façade, at the same time dis-connecting the retained façade from the temporary kentledge support and connecting it back to the new concrete frame apartment block.

The contract took a year to complete and now stands as a Portico entrance to the St. George development. The transformation completed, it became one of the key landmarks in Ealing and won the Prestigious ‘Best Façade Restoration’ of the year.

"

We aim to be the best at all times and recognise this can only be achieved by having the best people working for us to deliver that success. To run a successful construction business we believe that we need a mix of people with both professional and trades background.

Location

56-61 New Broadway, London W5 5AH